BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://pdrangers.org/
X-WR-CALNAME:PennDel Royal Rangers
X-WR-CALDESC:
X-WR-TIMEZONE:America/New_York
BEGIN:VTIMEZONE
TZID:America/New_York
X-LIC-LOCATION:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T030000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T010000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-70ece1e1e0931919438fcfc6bd5f199c@pdrangers.org
DTSTART;TZID=America/New_York:20260314T083000
DTEND;TZID=America/New_York:20260314T160000
DTSTAMP:20260308T212632Z
CREATED:20260308
LAST-MODIFIED:20260308
PRIORITY:5
SEQUENCE:31
TRANSP:OPAQUE
SUMMARY:Camp Berry Work Day
DESCRIPTION:March 14, 2026 WORK DAY – need all hands on deck  arrive ~ 8-8:30, we will provide lunch (or come on a day when you can and check with Steve what needs to be done)\n\n\nMaintenance – Steve added some John Deere radiator fluid to the green JD tractor.  Remainder can be used on other tractors.\nShower House – call Steve for latest needs  302-379-1580\n\nChange one occupancy sensor in #4 bathroom and one light fixture\nRake and seed around shower house.\nClean up concrete on sidewalks with grinder & touch up exterior block with mortar as needed (Steve can provide grinder and mortar cement in lower barn – – a little sand by barn)\nSort and fill the first aid cabinet – – materials are there\nInstall Mirrors\nClean up and ensure all drain covers fit properly, shower drains in handicap bathroom need to be un-plugged\nInstall “Hit the Target” decals on urinals\nFoam pipes that go thru sink countertops\nTie in plastic partition in handicap bathrooms\nInstall 6 outside door thresholds and 3M under door seal\n\n\nPlumbing work – -replace piping to pressurizers, tie in the heaters in the handicap bathrooms\nTesting – fill water tank, test pressurizers, water heaters, space heaters, faucets, urinals, toilets, showers – GOAL – finish by end of March\n\n
URL:https://pdrangers.org/events/work-day-2026-03/
CATEGORIES:Camp Berry,District,Main Calendar Events,Work Day
LOCATION:3495 Middle Rd, Honey Grove, PA 17035
ATTACH;FMTTYPE=image/jpeg:https://pdrangers.org/wp-content/uploads/2023/07/Showerhouse2.jpg
END:VEVENT
END:VCALENDAR
