BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.33.0//EN
X-ORIGINAL-URL:https://pdrangers.org/
X-WR-CALNAME:PennDel Royal Rangers
X-WR-CALDESC:
X-WR-TIMEZONE:America/New_York
BEGIN:VTIMEZONE
TZID:America/New_York
X-LIC-LOCATION:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T030000
RRULE:FREQ=YEARLY;BYMONTH=03;BYDAY=2SU
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T010000
RRULE:FREQ=YEARLY;BYMONTH=11;BYDAY=1SU
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-4abe17a1c80cbdd2aa241b70840879de@pdrangers.org
DTSTART;TZID=America/New_York:20260912T083000
DTEND;TZID=America/New_York:20260912T160000
DTSTAMP:20260521T204727Z
CREATED:20260521
LAST-MODIFIED:20260904
PRIORITY:5
SEQUENCE:36
TRANSP:OPAQUE
SUMMARY:Camp Berry Work Day
DESCRIPTION:\nGeesaman Garage\n\nImmediate need, the painting needs to be completed, as the building will be presented at the Adventure Weekend with signage as the Geesaman Garage\n\n\nShower House – final details\n\nAdjust 5 motion sensors – \n\n#4 bathroom stays on sometimes or comes back on, \nHandicap, Storage and Mechanical room – – adjust to turn off after 5 minutes (handicap ~ 10 minutes)\n\n\nClean up concrete on sidewalks with grinder & touch up exterior block with mortar as needed (Steve can provide grinder and mortar mix)\nRaking and seeding around shower house\nCut down plants around 5,000 gallon tank – will plan to build roof over the tank\n\n\nMaintenance\n\nInstall edge boards (borders) on rubber roofing under fence railings (entrance) and under water slide, may need to add some more rubber roofing near steps of water slide\nSpray weed area (front entrance and other areas)\n\n\nStain wood on steps and platform for slide\n\nWeed wack where necessary and especially around district trailer by lower pole barn, where the black smith shop will go\nTrim around water tank, brick and block area, etc.  Steve to provide power snips to cut thorny plants, saplings, etc.\nPlan shelves in shed for gasoline equipment, move down if ready, look at push mowers and get rid of ones that are not worth keeping – keep 2 best\nRepair Go Karts, work kart\nWe can go thru the items next to the store and trash what should be trashed and try to find a home for the rest.  (at the moment, we can’t put anything back in the farm house basement until complete.\nZip Line – tighten a bit to raise line for better clearance above back of pageant area  (Steve can provide guidance)\nCheck private property signs to make sure they are in properly\n\n\nDistrict box trailer\n\ninstall new rear lights.\n\n\nFarm House\n\nCut a trench to the little creek, put in fabric, perf pipe, stone, and tie in the downspout of the roof.  Later we can tie in air con condense line and Mini-split condense line\nAndy was going to create a stone pit for drain water in the farm house basement\n\n\nBlack Smith Shop\n\nFooter dug, stone ordered, will be followed with concrete for footer\nCheck with Rich Morrow to help get block installed\n\n\n\n
URL:https://pdrangers.org/events/work-day-2026-09/
CATEGORIES:Camp Berry,District,Main Calendar Events,Work Day
LOCATION:3495 Middle Rd, Honey Grove, PA 17035
ATTACH;FMTTYPE=image/jpeg:https://pdrangers.org/wp-content/uploads/2023/07/Showerhouse2.jpg
END:VEVENT
END:VCALENDAR
