Camp Berry Work Day
WORK-DAY LIST – Feb 10, 2024, Saturday, 8-4pm, Lunch provided
- Complete framing for ceiling
- Install insulation baffles
- Run MC Cable electrical runs to the bathrooms
- Run vent piping
- Put in pull strings in electrical pipes for proper lengths
- Cut windows into 2 outside doors and adjust latch plates
- Check for a possible leak in the drainage pipes
- Install settings on the septic dosing pump
- Dispose of some pallets and clean up leftover retainer cover stones and pallets
- Weather permitting we may start setting up the stone and sidewalks around the shower house