Camp Berry Work Day
March 14, 2026 WORK DAY – need all hands on deck arrive ~ 8-8:30, we will provide lunch (or come on a day when you can and check with Steve what needs to be done)
- Maintenance – Steve added some John Deere radiator fluid to the green JD tractor. Remainder can be used on other tractors.
- Shower House – call Steve for latest needs 302-379-1580
- Change one occupancy sensor in #4 bathroom and one light fixture
- Rake and seed around shower house.
- Clean up concrete on sidewalks with grinder & touch up exterior block with mortar as needed (Steve can provide grinder and mortar cement in lower barn – – a little sand by barn)
- Sort and fill the first aid cabinet – – materials are there
- Install Mirrors
- Clean up and ensure all drain covers fit properly, shower drains in handicap bathroom need to be un-plugged
- Install “Hit the Target” decals on urinals
- Foam pipes that go thru sink countertops
- Tie in plastic partition in handicap bathrooms
- Install 6 outside door thresholds and 3M under door seal
- Plumbing work – -replace piping to pressurizers, tie in the heaters in the handicap bathrooms
- Testing – fill water tank, test pressurizers, water heaters, space heaters, faucets, urinals, toilets, showers – GOAL – finish by end of March