• Shower House
    1. Some plumbing supply pipes and then connecting drains for sinks and urinals, setting toilets & connecting to water source.
      1. We will see if some of the leaders can help with the drainage connections
      2. Gas connections for water heaters and then testing with water and faucets turned on & showers
    2. Insulation – -can be blown in to the attic and we can get that separate inspection
    3. Floors – Ron and Steve are working on coves for shower wall to floor interface
      1. At present, I think we can pass on getting the complete floor painted, but we should have enough white epoxy pool paint to do all the shower floors and probably the toilet areas too
    4. Vents for water heating and space heating – -almost done – just need a little more work – -Ron and Steve can take care of that.  Mike was looking for one fitting.
    5. Partitions need to be added once floor painting is done – -We will see if we can get some leaders to come help with that
    6. Septic Field – – Jeff Holman is lined up to do it, sand and stone are lined up, needed pipes are on a trailer near the proposed field area – – we have been waiting for dryer weather so heavy sand trucks can get up the hill to where the sand is needed.
    7. Electrical – -Joe Brockmeyer will complete the electric for the dosing pump and we may have two occupancy (motion) sensors that need to be adjusted.
    8. Benches – Tim Fichtner has completed the benches for the showers.  Curtain railings is in and hooks for clothes.  We have the curtains and mats for the floor.