Camp Berry Work Day
- Shower House inside Block Work, install top plates for several walls
- Unload trailer of toilet stall dividers and doors
- Lawn Staple Underlayment of Water Slide (in farm house dining room long counter on right)
- Check batwing, grease, sharpen blades Hydraulics & PTO check – Rodney Shuey
- Plans for water control on 5,000 gallon tank – Dave Hall
- Kitchen – caulking for ceiling – prevent insects (foam and caulk available), arrange items in plastic bins
- Lower Pole Barn – Install hand fuel pump