Camp Berry Work Day
WORK-DAY– March 9, 2024, Saturday, 8-4pm, Lunch provided
- Complete framing for ceiling
- Install insulation baffles
- Run MC Cable electrical runs to the bathrooms
- Run vent piping
- Put in pull strings in electrical pipes for proper lengths
- Cut windows into 2 outside doors and adjust latch plates, install door closers
- Install settings on the septic dosing pump
- Move sand to General Store portico
- Weather permitting, cast first countertop for shower house