Camp Berry Work Day

WORK-DAY– March 9, 2024, Saturday, 8-4pm, Lunch provided

  • Complete framing for ceiling
  • Install insulation baffles
  • Run MC Cable electrical runs to the bathrooms
  • Run vent piping
  • Put in pull strings in electrical pipes for proper lengths
  • Cut windows into 2 outside doors and adjust latch plates, install door closers
  • Install settings on the septic dosing pump
  • Move sand to General Store portico
  • Weather permitting, cast first countertop for shower house