Camp Berry Work Day

Work Day – November 16, 2024

  • Finish Fiberglass Ceiling and Walls
  • Make access door in central hallway
  • Put in ceiling and access doors in Storage and Mechanical Room  (use drywall if fiberglass runs out).
  • Add gray plastic strips to the long side of fiberglass sheets – -gray plastic needs to be cut – probably 1-1/2” wide
  • Electrical
    • Foam boxes in handicap bathrooms and put covers on
    • Wire in motion sensors – in handicap bathrooms and storage and mechanical rooms – test lights and fans
    • Emergency Lights – install 2 more with remote lights outside doors (leave battery unconnected until bldg. goes into use)
    • Install ground rods/wire
    • Farm House – ring out all circuits and note on a breaker plan
  • Finish sink countertops with smooth cement th
  • Once sink countertops are finished, apply pool paint (white or tinted?)
  • Level ground around septic tanks
  • Install fence
  • Install rubber roofing under fence
  • Install with lawn staples
  • Add lawn staples to entrance rubber roofing ground cover
  • Install rubber roofing and lawn staples at water slide
  • Research and install plastic partitions in handicap and other bathrooms if it doesn’t interfere with painting floor
  • Install 48″ grab bars in handicap bathrooms
  • Plumbing – under Mike Ardeno direction
    • Install screen on 4” exhaust vent above shower house roof
    • Find missing vent pipe connection and plug (under floor)
    • Install 4 water heaters
    • Install supply pipe – – red for output of water heaters and blue for cold water to toilets and urinals
    • Install shower heads and shut offs
    • Install urinals
    • Install sinks and faucets after countertops finished
  • 00

    days

  • 00

    hours

  • 00

    minutes

  • 00

    seconds

Date

Nov 16 2024

Time

8:00 am - 4:00 pm

Location

Camp Berry
Camp Berry
3495 Middle Rd, Honey Grove, PA 17035
QR Code