Camp Berry Work Day
Finish Fiberglass Ceiling and Walls (except ceiling in handicap bathrooms until gas pipe is changed)
Make ceiling access door in central hallway
Put in ceiling and access doors in Storage and Mechanical Room (use drywall if fiberglass runs out – but looks like we have plenty of fiberglass).
Add gray plastic strips to the long side of fiberglass sheets – -gray plastic needs to be cut – probably 1-1/2” wide
Electrical
Few more boxes to wire in 4 bathrooms for water and space heaters
Wire in remaining motion sensors – in 4 bathrooms, handicap bathrooms and storage and mechanical rooms – test lights and fans
Finish dosing pump wiring – -Complete
Emergency Lights – install 2 more with remote lights outside doors (leave battery unconnected until bldg. goes into use)
Install ground rods/wire (need to dig up bare copper wire below water spigots)
Farm House – ring out all circuits and note on a breaker plan
Finish sink countertops with smooth cement then pool paint
Level ground around septic tanks
Install fence
Install rubber roofing under fence
Install with lawn staples
Add lawn staples to entrance rubber roofing ground cover as needed
Install rubber roofing and lawn staples at water slide
Research and install plastic partitions in handicap and other bathrooms if it doesn’t interfere with painting floor
Install grab bars in handicap bathrooms – completed except for 48” units
Add combo lock to RV pump house – -Complete
Put mouse/rat poison plastic units in farmhouse basement, shed, lower pole barn, barn basement, pump houses – Complete – -check bait
Plumbing – under Mike Ardeno direction
Install screen on 4” exhaust vent above shower house roof – -anyone could go up tall ladder and attach
Find missing vent pipe connection and put plug in the hole (under floor)
Install 4 water heaters
Install supply pipe – – red for output of water heaters and blue for cold water to toilets and urinals
Install shower heads and shut offs
Install urinals
Install sinks and faucets after countertops finished