Camp Berry Work Day

May 10, 2025 WORK DAY – need all hands on deck

  • Shower House – call Steve for latest needs  302-379-1580
    • Finish painting countertops – block filler first, then 2 part  epoxy
    • Install sinks & faucet system
    • Sinks, toilets, divider panels, shower curtains, etc.
    • Caulk any holes, and touch up with block filler and then epoxy walls in shower areas
    • Install hardware for shower curtains
    • Make 16 benches for shower and 4 for wall between sink and urinals
    • Install curtains in the windows
    • Clean up concrete on sidewalks with grinder (Steve can provide)
    • Finish trim per example by Rowland Troutman
    • Paint the 10 doors carefully – – green for outside and tan for inside
    • Move keybox to shower house between Storage room and Handicap bathroom
    • Install 4 thermostats and wire to space heaters
    • Install gas flex pipe from black pipe to space and water heaters
    • Install Split Rail Fence around septic tanks, above retaining wall (after septic field is in)
    • Grind floor and acid wash
    • Paint floor – & insulate attic – Rowland is arranging for that
    • Install toilets – when Mike Ardeno is ready
    • Install urinals – when Mike Ardeno is ready
    • Ground cover at top of water slide area needs to be done with rubber roofing
  • 00

    days

  • 00

    hours

  • 00

    minutes

  • 00

    seconds

Date

May 10 2025

Time

8:00 am - 4:00 pm

Location

Camp Berry
Camp Berry
3495 Middle Rd, Honey Grove, PA 17035
QR Code