Camp Berry Work Day
July 12, 2025 WORK DAY – need all hands on deck arrive ~ 8-8:30, we will provide lunch (or come on a day when you can and check with Steve what needs to be done)
- Maintenance – change oil, filters on tractors, check coolant, etc., grease (contact Wyatt Garrett if you can help)
- Prep for JLDA/Action Camps
- Need a list from Chris/Abraham
- Shower House – call Steve for latest needs 302-379-1580
- Finish ceilings/access panels in storage, mechanical and handicap bathrooms & trim
- Adjust motion sensors
- Plan how to use divider panels in bathrooms (located outside shower house)
- Install faucet system, connect drains
- Install cove and water barrier in showers
- Clean up concrete on sidewalks with grinder (Steve can provide)
- Paint the 10 doors carefully – – green for outside and tan for inside
- Install gas flex pipe from black pipe to space and water heaters
- Install Split Rail Fence around septic tanks, above retaining wall (after septic field is in)
- Grind floor and epoxy floor – Rowland has contact
- Insulate attic – Rowland is arranging for that
- Install toilets – after floor coating is done
- Ground cover at top of water slide area needs to be done with rubber roofing
- Make rubber roofing more secure over 5,000 gallon water tank
- Finish wiring to septic dosing pump
- Finish piping, test water and heaters