Camp Berry Work Day
Sep 13, 2025 WORK DAY – need all hands on deck arrive ~ 8-8:30, we will provide lunch (or come on a day when you can and check with Steve what needs to be done)
- Maintenance – Wyatt changed all oil and greased – but make sure to grease tractors when using
- Shower House – call Steve for latest needs 302-379-1580
- Adjust motion sensors – #4 bathroom stays on – -change those to 5 minutes and hall unit and extend handicap and 2 other rooms to 5 minutes – -check that they all turn off after 5 minutes
- Rake and seed around septic tanks and shower house. Clean a little space around the septic tank lids.
- Clean up concrete on sidewalks with grinder & touch up exterior block with mortar as needed (Steve can provide grinder and mortar cement in lower barn – – a little sand by barn)
- Paint the 10 doors carefully – – green for outside and tan for inside – use flow extender for nice finish Paint in shower house, may want to bring a brush
- Install Split Rail Fence around septic tanks, above retaining wall (after septic field is in)
- Ground cover at top of water slide area needs to be done with rubber roofing – in lower pole barn
- Add pinned border to rubber roof at front entrance wall – – 12” nails to hold boards in – – see Steve
- Make rubber roofing more secure over 5,000 gallon water tank