Camp Berry Work Day

  • Geesaman Garage
    • Immediate need, the painting needs to be completed, as the building will be presented at the Adventure Weekend with signage as the Geesaman Garage
  • Shower House – final details
    • Adjust 5 motion sensors –
      • #4 bathroom stays on sometimes or comes back on,
      • Handicap, Storage and Mechanical room – – adjust to turn off after 5 minutes (handicap ~ 10 minutes)
    • Clean up concrete on sidewalks with grinder & touch up exterior block with mortar as needed (Steve can provide grinder and mortar mix)
    • Raking and seeding around shower house
    • Cut down plants around 5,000 gallon tank – will plan to build roof over the tank
  • Maintenance
    • Install edge boards (borders) on rubber roofing under fence railings (entrance) and under water slide, may need to add some more rubber roofing near steps of water slide
    • Spray weed area (front entrance and other areas)
  • Stain wood on steps and platform for slide
    • Weed wack where necessary and especially around district trailer by lower pole barn, where the black smith shop will go
    • Trim around water tank, brick and block area, etc.  Steve to provide power snips to cut thorny plants, saplings, etc.
    • Plan shelves in shed for gasoline equipment, move down if ready, look at push mowers and get rid of ones that are not worth keeping – keep 2 best
    • Repair Go Karts, work kart
    • We can go thru the items next to the store and trash what should be trashed and try to find a home for the rest.  (at the moment, we can’t put anything back in the farm house basement until complete.
    • Zip Line – tighten a bit to raise line for better clearance above back of pageant area  (Steve can provide guidance)
    • Check private property signs to make sure they are in properly
  • District box trailer
    • install new rear lights.
  • Farm House
    • Cut a trench to the little creek, put in fabric, perf pipe, stone, and tie in the downspout of the roof.  Later we can tie in air con condense line and Mini-split condense line
    • Andy was going to create a stone pit for drain water in the farm house basement
  • Black Smith Shop
    • Footer dug, stone ordered, will be followed with concrete for footer
    • Check with Rich Morrow to help get block installed
  • 00

    days

  • 00

    hours

  • 00

    minutes

  • 00

    seconds

Date
Sep 12 2026
Time
8:30 am - 4:00 pm
Location
Camp Berry
Camp Berry
3495 Middle Rd, Honey Grove, PA 17035
QR Code