Camp Berrry Work Day
Clean and assembly 4 plastic/metal picnic tables
Weed Wacking
Lawn staples for underlayment of Water Slide
Shower House – Block work, insulation baffles, top plates, install snow guard rails, prepare vent pipe lay out
Retaining Wall – glue on cap blocks and end blocks
Mow shooting sports area
Clean Farm House
Open and clean 2 air cons
Install air con in kitchen
Excavation – Install perf pipe in lawn near big barn, grading around shower house, meet with Septic inpsector
Install Lock and door knob on lower door of farm house
Put tarp on wire rack shelves in Farm house basement and move supplies to those shelves
Move fluorescent light, make LED for light for wire rack shelves.
Continue clean up of farm house basement