Camp Berrry Work Day
- Central Electric Distribution facility
- Trim, lights/wire, soffit
- Pipe from pole to meter base
- Install pull strings
- Install panel in Shower House
- Shower House
- Install insulation baffles
- Add 2x4s where needed for ceiling and wall panels
- IF TIME ALLOWS
- Clean up extra retaining wall block/pallets
- Move more brick to front, move block near shower house to the back
- Dig hole for septic tanks
- Clean out farmhouse basement