Camp Berrry Work Day
Our last work day for the year, we are continuing on the inside of the Shower House. Lunch will be provided.
- Hole for septic tanks
- Upper Framing can be completed
- Insulation baffles can be installed
- Venting pipes can be extended and tied into 4” pipes (have all needed fitings)
- Central Distribution Center can be completed – lighting circuit and soffit installed
- Filter for farm house fuel oil furnace can be installed
- Brick and block can be moved
- Service tractors