  • April 1 – Work Day – Prep Mowers, Shower House block walls, install diesel fuel pump in lower pole barn
  • April 4 – Continued work on entrance wall
  • April 14 – Work on interior shower walls and entrance wall – (multiple weeks)
  • April 15 – Entrance wall work (multiple weeks), excavation for electric to wall
  • April 21-23 – Frontiersman Camping Fellowship Spring Trace
  • May 1-3 – Summit Conference
  • May 20 – 6” Sewer Pipe installation
  • May 26-28 – SCW Sectional PowWow and Group from Newville Assembly
  • June 10 – Work day, shower house Interior walls completed before PowWow
  • June 23-25 – PennDel Royal Ranger PowWow
  • June 29 – Continuing work on entrance wall

April 1 – Work Day


April 4 – continued work on entrance wall

April 14 – Work on interior shower walls and entrance wall

April 15 – Entrance wall work, excavation for electric to wall

April 21-23 FCF Spring Trace

April 28

May 1-3 – Summit Conference

District Director Steve Steffel representing Royal Rangers at the Summit Conference

May 13 – Sewer Pipe installation

May 26-28 – SCW Sectional PowWow and Group from Newville Assembly

May 26-29  A group from Newville Assembly of God enjoy the RV area

June 10 Workday

June 23-25 – PennDel Royal Ranger PowWow

June 29 – Continuing work on entrance wall